
Separate the crew route from the unloading route
Trace the walk from the active work area to the door. If it crosses a reversing area, narrow gate or material drop, ask the site manager to reconsider the position. Do not solve a traffic conflict by directing workers over another property or a public verge without permission.
Describe the ground honestly
Photographs help show slopes, soft edges, surface transitions and overhead obstructions. Ask the provider to review setup suitability and any protection required. A drawing marked 'flat area' is not enough if the usable ground changes after excavation or rain.
Reserve access for the next visit
Check the service approach after the equipment is placed, not just the initial delivery path. Include the possible effect of scaffolding, skips, parked machinery and stored supplies. If the approved position becomes unsuitable, arrange a revised plan rather than dragging or lifting the unit yourself.
Questions before you book
Can a toilet go beside the site fence?
Only if the actual ground, door approach, service access and permission work. The fence line alone does not establish a suitable position.
What should I photograph?
The entrance, the intended position and the path between them. Include obstacles and tell the reviewer which features are temporary.